On dates

Some of the ECMap informational messages are the result of problems with dates.

Table 1-6 lists the format, cause, and solution (if applicable) for the ECMap messages related to dates, in numeric order by message number.

Table 1-6: ECMap messages related to dates

Message

Cause

Solution

(1400) ??????: Invalid Century Minimum at line <>

(1401) ???????: Invalid Date Flag at line <>

(1402) ?????: < > Century Minimum Required To Run Map after 9/30/1999

A result of Y2k logic.

Starting with version 4.5 and higher, Y2k date logic must be used. Choose the Utilities/Update Date option to assist you in this process.