After perfoming the upgrade, there are some additional tasks you may need to perform.
Log in to Mobile Web Studio and change the action type of linked applications you upgraded from 6.5 to 7.0.
If you have created or changed the following files or applications, you must either re-create them or manually merge them:
If you have any customized .jsp files from onepage\fw\baseApps, you must manually merge them.
If you change the location of the installation, you must manually copy custom .jsp files to the same subdirectory in the new installation directory.
If you modified the main index.jsp file from the onepage directory, you must manually merge them
If you have created a cobrand directory, verify the the installer retained the directory.
If you have customized images, check them, and if necessary copy them from your backup.
Verify that any advanced applications you created, such as server-side click-across, linked applications with update, charting, offline BlackBerry, etc. are working correctly. If they are not, you must re-create them..
Check the DefaultResourceID in the global.properties.xml file to verify that it is 21. If it is not 21, you must change the property manually to get the same UA look and feel when you create new resources.
If you use the CMC, after performing the upgrade, run this command:
run -logLevel FINEST -initDatabase true
Copyright © 2005. Sybase Inc. All rights reserved. |
![]() |