Chapter 6 Simulating a Business Process Model
How does simulation work in PowerDesigner?
Simulating the BPM using SIMUL8 implies the following phases:
- Prepare the BPM objects for a SIMUL8 model generation by defining specific properties
- Generate a SIMUL8 model understandable by SIMUL8 in PowerDesigner application
- Enrich the SIMUL8 model in SIMUL8 application
- Launch a simulation in SIMUL8 application
- Analyze the results, perform adjustments and re-launch a simulation in SIMUL8 application, if required
- Reverse a SIMUL8 model into an existing BPM in PowerDesigner when simulation results reveal problems that can be solved in PowerDesigner
- Correct the BPM according to the simulation results
Copyright (C) 2008. Sybase Inc. All rights reserved.
|
|