Chapter 19 Working with Sybase Unwired Orchestrator
Fault handling is authorized only within Complex and Loop Activities.
You handle the Fault event created within a Complex Activity (composite process) using an outgoing flow that catches this event.
Since the Fault activity constitutes an End activity within an Orchestrator Complex Activity, you can use a PowerDesigner end object with <<Fault>> stereotype.
Since the Complex Activity cannot have more than one Fault handler you can use an outgoing flow with Business Error type.
Copyright (C) 2007. Sybase Inc. All rights reserved. |
![]() |