[CR #536574] ETL performance may degrade when you save jobs containing greater than 20 projects. Factors such as available memory and database space also affect performance.
Workaround: You can do one of:
Increase the available database space for the database that holds the ETL repository.
Break the job into several smaller jobs.
Use the IQ Loader DB via Insert Location component to transfer a large number of tables.