Synchronizer controls the flow of the job execution.
Use this component to control the flow of the job depending on the status of previously executed projects. You can define each project as critical or non-critical. Critical project failures cause the Synchronizer to signal failure.
Adding
and configuring the Synchronizer component
Add the component to the job and connect it with all the projects that signal their execution status to this component.
(Optional) In the Property window click the Synchronize Options icon to select critical projects.