Creating a Requirement View

You can create a requirement view in an existing RQM in any of the following ways:


Tool

Description



Create a Requirements Document View - with the same hierarchy of requirements as the original view. You can modify the new view without altering the original view.



Create a Traceability Matrix View - with the same traceability links as the original view. You can modify the new view without altering the original view.



Create a User Allocation Matrix View - with the same links as the original view. You can modify the new view without altering the original view.

Warning!  

The new requirements view may be identical to the original requirements view. To make sure that a new requirements view has been created, check its name in the PowerDesigner general title bar or in the Browser tree.


Created October 7, 2009. Send feedback on this help topic to Sybase Technical Publications: pubs@sybase.com