[CR #169962] The status of routes as shown by Sybase Central has two possible values:
Up
Down
Since Sybase Central does not show whether these routes are being created or were dropped, you cannot determine if route creation is complete by simply looking at the route status in Sybase Central.
Workaround: When the route drop/add connection is complete, refresh the screen to reveal the correct route status.