Issue #: 264021
Problem: If an event set is changed in the database (using EDLUtil), and a business process that imports this event set is repackaged in the GUI, it will not pick up changes to the event set. The only time that changes are picked up is if something in the business process is modified using Process Designer (such as a task), and then "Save Changes" is selected.
Workaround: Make some modification to the business process and then remove the modification. (For example, add a task and then delete that task.) Save the changes to the process. Since the system thinks that the process has changed, the business process will be repackaged, thereby picking up the database changes to the eventset.
Copyright © 2002. Sybase Inc. All rights reserved. |
![]() |