Bridging versions 4.1 and 5.5

To bridge e-Biz Impact version 4.1 and version 5.5, use two TCP/IP message AIMs, one running in 4.1, and one running in 5.5. Connect the 4.1 message AIM to the 5.5 message AIM, depending on the intended destination of the DFC. For example, to send a DFC from version 4.1 to 5.5, execute the call from 4.1, connect the 4.1 AIM to the 5.5 AIM, and configure 5.5 as the listener.

To enable bidirectional communication, set up four AIMs, two in version 4.1 and two in version 5.5. In each version, configure one AIM to connect to the listener in the other version. Configure the second AIM in each version to listen for the AIM in the other version to connect.